Assessment Year | 2001 |
---|---|
Principal Product | Eastern White Pine Board |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $50 M to 100M |
# of Employees | 235 |
Plant Area |
170,000
ft2
|
Annual Production | 65,000
thousand feet
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,318,223 | 19,441,380 |
kWh
|
$0.068 |
Electricity Demand | $274,437 | 42,403 |
kW-mo/yr
|
$6.47 |
Electricity Fees | $14,725 | - |
|
- |
Wood | $283,007 | 196,627 |
MMBtu
|
$1.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $159,102 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $47,575 | $350,000 |
$63,255
859,443
kWh
|
$4,628
-
kW-mo/yr
|
$(-15,308.0)
-
MMBtu
|
$(-5,000.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,719 | $45,000 |
$12,548
170,486
kWh
|
- |
$29,171
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,719 | $20,000 |
$21,719
259,100
kWh
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $14,725 | $35,000 | - |
$14,725
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $13,562 | $18,000 |
$13,562
184,270
kWh
|
- | - | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $9,262 | $10,000 |
$9,262
125,847
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,051 | $12,900 |
$5,051
68,630
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $4,264 | $2,000 |
$4,264
57,930
kWh
|
- | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,225 | $5,950 |
$1,225
16,644
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $159,102 | $498,850 |
$130,886
1,742,350
kWh
|
$19,353
-
kW-mo/yr
|
$13,863
-
MMBtu
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | $18,989 | $37,000 |
$4,264
57,930
kWh
|
$14,725
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs