ITAC Assessment: MA0500
ITAC logo
ITAC Assessment: MA0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Eastern White Pine Board
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 170,000
ft2
Annual Production 65,000
thousand feet
Production Hrs. Annual 4,940
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,318,223 19,441,380
kWh
Electricity Demand $274,437 42,403
kW-mo/yr
Electricity Fees $14,725 -
Wood $283,007 196,627
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $47,575 $350,000 $63,255
859,443
kWh
$4,628
-
kW-mo/yr
$(-15,308.0)
-
MMBtu
$(-5,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,719 $45,000 $12,548
170,486
kWh
- $29,171
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,719 $20,000 $21,719
259,100
kWh
- - -
04 2.3212: Optimize plant power factor $14,725 $35,000 - $14,725
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $13,562 $18,000 $13,562
184,270
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $9,262 $10,000 $9,262
125,847
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,051 $12,900 $5,051
68,630
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $4,264 $2,000 $4,264
57,930
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,225 $5,950 $1,225
16,644
kWh
- - -
TOTAL RECOMMENDED $159,102 $498,850 $130,886
1,742,350
kWh
$19,353
-
kW-mo/yr
$13,863
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $18,989 $37,000 $4,264
57,930
kWh
$14,725
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs