ITAC Assessment: MA0497
ITAC logo
ITAC Assessment: MA0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Easter White Pine Boards
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 2,255,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 4,080
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,978 3,809,712
kWh
Electricity Demand $28,959 13,413
kW-mo/yr
Electricity Fees $7,574 -
LPG $4,218 305
MMBtu
Fuel Oil #2 $192,204 29,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Other Energy Savings Administrative Changes Savings Primary Raw Material Savings
01 2.8112: Combine utility meters $38,169 $79,800 n/a - - - - - $38,169 -
02 4.132: Purchase new equipment to reduce material use / cost $22,000 $50,000 - - - - - - $22,000
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,603 $62,600 $16,603
219,912
kWh
- - - - - -
04 2.2414: Use waste heat from hot flue gases to preheat $13,314 $28,000 - - - $13,314
-
MMBtu
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,298 $17,500 $10,766
138,555
kWh
- $1,532
-
MMBtu
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,958 $13,000 - - - - $5,958
-
MMBtu
- -
07 2.2531: Re-size charging openings or add movable cover or door $5,951 $1,200 - - $5,951
-
MMBtu
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,012 $10,200 $4,012
53,139
kWh
- - - - - -
09 2.2511: Insulate bare equipment $1,884 $2,000 - - - $1,884
-
MMBtu
- - -
10 2.4221: Install compressor air intakes in coolest locations $1,424 $2,000 $1,424
18,330
kWh
- - - - - -
11 2.2511: Insulate bare equipment $1,408 $800 - - - $1,408
-
MMBtu
- - -
12 2.3212: Optimize plant power factor $1,325 $4,500 - $1,325
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $124,346 $271,600 $32,805
429,936
kWh
$1,325
-
kW-mo/yr
$7,483
-
MMBtu
$16,606
-
MMBtu
$5,958
-
MMBtu
$38,169 $22,000
TOTAL IMPLEMENTED $44,406 $76,000 $12,190
156,885
kWh
$1,325
-
kW-mo/yr
$7,483
-
MMBtu
$1,408
-
MMBtu
- - $22,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Other Energy Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs