| Assessment Year | 2001 |
|---|---|
| Principal Product | Easter White Pine Boards |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $5 M to 10M |
| # of Employees | 18 |
| Plant Area |
46,450
ft2
|
| Annual Production | 5,000
thousand feet
|
| Production Hrs. Annual | 2,140
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $63,196 | 721,366 |
kWh
|
$0.088 |
| Electricity Demand | $8,912 | 4,959 |
kW-mo/yr
|
$1.80 |
| Electricity Fees | $2,889 | - |
|
- |
| Fuel Oil #2 | $33,307 | 4,276 |
MMBtu
|
$7.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,209 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4311: Recover mechanical energy | $9,000 | $40,000 |
$4,000
51,252
kWh
|
- | $5,000 | |
| 02 | 2.2437: Recover waste heat from equipment | $6,447 | $17,000 | - |
$6,447
-
MMBtu
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,736 | $23,650 |
$4,736
60,713
kWh
|
- | - | |
| 04 | 2.7313: Recycle air for heating, ventilation and air conditioning | $3,155 | $50,000 | - |
$3,155
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,200 | - |
$2,200
28,206
kWh
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $1,090 | $1,100 | - |
$1,090
-
MMBtu
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $846 | $3,000 |
$846
10,840
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $73 | $400 |
$73
931
kWh
|
- | - | |
| TOTAL RECOMMENDED | $27,547 | $135,150 |
$11,855
151,942
kWh
|
$10,692
-
MMBtu
|
$5,000 | ||
| TOTAL IMPLEMENTED | $13,209 | $44,500 |
$7,119
91,229
kWh
|
$1,090
-
MMBtu
|
$5,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs