ITAC Assessment: MA0496
ITAC logo
ITAC Assessment: MA0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Easter White Pine Boards
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 18
Plant Area 46,450
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 2,140
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,196 721,366
kWh
Electricity Demand $8,912 4,959
kW-mo/yr
Electricity Fees $2,889 -
Fuel Oil #2 $33,307 4,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4311: Recover mechanical energy $9,000 $40,000 $4,000
51,252
kWh
- $5,000
02 2.2437: Recover waste heat from equipment $6,447 $17,000 - $6,447
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,736 $23,650 $4,736
60,713
kWh
- -
04 2.7313: Recycle air for heating, ventilation and air conditioning $3,155 $50,000 - $3,155
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,200 - $2,200
28,206
kWh
- -
06 2.2136: Install / repair insulation on steam lines $1,090 $1,100 - $1,090
-
MMBtu
-
07 2.6218: Turn off equipment when not in use $846 $3,000 $846
10,840
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $73 $400 $73
931
kWh
- -
TOTAL RECOMMENDED $27,547 $135,150 $11,855
151,942
kWh
$10,692
-
MMBtu
$5,000
TOTAL IMPLEMENTED $13,209 $44,500 $7,119
91,229
kWh
$1,090
-
MMBtu
$5,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs