ITAC Assessment: MZ0183
ITAC logo
ITAC Assessment: MZ0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product furnatures and fittings
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 22,000
ft2
Annual Production 8,500
pieces
Production Hrs. Annual 8,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,540 1,323,216
kWh
Natural Gas $3,670 318
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,331 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $847 $1,500 $847
9,674
kWh
-
02 3.1161: Eliminate/reduce an operation $562 - $562
6,416
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,085 $980 $4,085
46,653
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,266 $3,750 $1,266
14,453
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $4,719 $10,000 $4,719
53,891
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $852 - $403
4,604
kWh
$449
-
MMBtu
TOTAL RECOMMENDED $12,331 $16,230 $11,882
135,691
kWh
$449
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs