Assessment Year | 2001 |
---|---|
Principal Product | Fabricated metal products |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 106 |
Plant Area |
52,000
ft2
|
Annual Production | 535,000
pieces
|
Production Hrs. Annual | 5,300
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,735 | 914,120 |
kWh
|
$0.071 |
Electricity Demand | $31,924 | 3,646 |
kW-mo/yr
|
$8.76 |
Natural Gas | $26,214 | 2,766 |
MMBtu
|
$9.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 4.452: Eliminate shift | $19,200 | - |
$14,200
168,200
kWh
|
$5,000
-
MMBtu
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $10,500 | $800 |
$1,600
19,600
kWh
|
$8,900
-
MMBtu
|
- | |
03 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $4,300 | $25,000 | - |
$4,300
-
MMBtu
|
- | |
04 | 4.131: Modify process to reduce material use/cost | $3,300 | - | - | - | $3,300 | |
05 | 2.2437: Recover waste heat from equipment | $1,700 | $5,000 | - |
$1,700
-
MMBtu
|
- | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,400 | $8,000 |
$1,400
16,200
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $900 | $350 |
$900
10,400
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $800 | $1,100 |
$800
9,100
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $300 | $2,000 |
$300
3,500
kWh
|
- | - | |
TOTAL RECOMMENDED | $42,400 | $42,250 |
$19,200
227,000
kWh
|
$19,900
-
MMBtu
|
$3,300 | ||
TOTAL IMPLEMENTED | $17,200 | $7,250 |
$3,300
39,100
kWh
|
$10,600
-
MMBtu
|
$3,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs