Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Corrugated Cardboard
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 200,000
ft2
Annual Production 720,000
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,253 4,495,000
kWh
Electricity Demand $78,214 13,356
kW-mo/yr
Electricity Fees $807 -
Natural Gas $270,588 46,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Water Consumption Savings
01 2.8114: Change rate schedules or other changes in utility service $19,400 $93,000 - - $26,100
-
MMBtu
$(-6,700.0)
-
MMBtu
- -
02 2.3212: Optimize plant power factor $15,900 $13,000 - $15,900
-
kW-mo/yr
- - - -
03 2.7224: Reduce space conditioning during non-working hours $8,590 $30,000 - - $8,590
-
MMBtu
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $7,900 $23,000 - - $7,900
-
MMBtu
- - -
05 2.7231: Use radiant heater for spot heating $5,430 $25,000 - - $5,430
-
MMBtu
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,200 $13,000 - - $5,200
-
MMBtu
- - -
07 3.5131: Recycle white water $5,000 $20,000 - - - - $3,000
-
Tgal
$2,000
-
Tgal
08 3.4155: Meter waste water $4,400 $12,000 - - - - $4,400
-
Tgal
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,040 $450 $2,040
34,100
kWh
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,700 $5,000 $1,700
28,000
kWh
- - - - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $1,500 $7,000 $1,500
24,900
kWh
- - - - -
12 2.7132: Install timers on light switches in little used areas $1,000 $600 $1,000
18,300
kWh
- - - - -
TOTAL RECOMMENDED $78,060 $242,050 $6,240
105,300
kWh
$15,900
-
kW-mo/yr
$53,220
-
MMBtu
$(-6,700.0)
-
MMBtu
$7,400
-
Tgal
$2,000
-
Tgal
TOTAL IMPLEMENTED $2,040 $450 $2,040
34,100
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs