ITAC Assessment: KU0553
ITAC logo
ITAC Assessment: KU0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product plastic profiles and sheets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 110,000
ft2
Annual Production 3,500
ton
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,601 8,804,400
kWh
Electricity Demand $103,759 20,640
kW-mo/yr
Electricity Fees $66 -
Natural Gas $8,954 4,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $2,828 $6,750 $2,166
117,234
kWh
$662
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $2,466 $2,560 $1,469
79,426
kWh
$997
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $2,117 $3,116 $1,709
92,321
kWh
$599
-
kW-mo/yr
$(-191.0)
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,081 $90 $787
42,497
kWh
$294
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $618 $494 $450
24,326
kWh
$168
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $374 $230 - - $374
-
MMBtu
TOTAL RECOMMENDED $9,484 $13,240 $6,581
355,804
kWh
$2,720
-
kW-mo/yr
$183
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs