ITAC Assessment: MA0479
ITAC logo
ITAC Assessment: MA0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Latches
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 70,000
ft2
Annual Production 9,603,500
pieces
Production Hrs. Annual 4,680
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,248 1,311,841
kWh
Electricity Demand $47,803 3,445
kW-mo/yr
Electricity Fees $7,178 -
Natural Gas $17,563 3,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $7,300 $3,000 - - $7,300
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $6,900 $8,400 $6,900
108,441
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,310 $550 $2,310
36,342
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,760 $5,800 $2,550
39,566
kWh
$170
-
kW-mo/yr
$(-960.0)
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $930 - $930
14,654
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $750 $1,250 $750
12,016
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $320 $1,400 $390
6,155
kWh
$120
-
kW-mo/yr
$(-190.0)
-
MMBtu
TOTAL RECOMMENDED $20,270 $20,400 $13,830
217,174
kWh
$290
-
kW-mo/yr
$6,150
-
MMBtu
TOTAL IMPLEMENTED $18,190 $13,200 $10,890
171,453
kWh
- $7,300
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs