ITAC Assessment: MA0478
ITAC logo
ITAC Assessment: MA0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 35,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,396 2,029,895
kWh
Electricity Demand $64,977 8,229
kW-mo/yr
Electricity Fees $4,795 -
Fuel Oil #6 $169,477 39,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $50,450 $222,000 $(-6,750.0)
(-73,271)
kWh
- $57,200
-
MMBtu
- -
02 4.652: Replace existing equipment with more suitable substitutes $9,000 $40,000 $4,000
43,962
kWh
- - $5,000 -
03 2.3212: Optimize plant power factor $6,350 $5,500 - $6,350
-
kW-mo/yr
- - -
04 2.2123: Insulate feedwater tank $3,300 $2,500 - - $3,300
-
MMBtu
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $2,960 - $2,960
32,239
kWh
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,870 $13,000 - - $2,870
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,000 $550 $2,000
21,688
kWh
- - - -
08 4.821: Pay bills on time to avoid late fees $1,244 - - - - - $1,244
09 2.6231: Utilize controls to operate equipment only when needed $1,080 $2,000 $1,080
11,723
kWh
- - - -
10 2.7135: Install occupancy sensors $320 $450 $220
2,345
kWh
$100
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $79,574 $286,000 $3,510
38,686
kWh
$6,450
-
kW-mo/yr
$63,370
-
MMBtu
$5,000 $1,244
TOTAL IMPLEMENTED $14,930 $9,000 $5,180
56,272
kWh
$6,450
-
kW-mo/yr
$3,300
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs