Assessment Year | 2000 |
---|---|
Principal Product | Lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
35,000
ft2
|
Annual Production | 10,000
thousand feet
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $189,396 | 2,029,895 |
kWh
|
$0.093 |
Electricity Demand | $64,977 | 8,229 |
kW-mo/yr
|
$7.90 |
Electricity Fees | $4,795 | - |
|
- |
Fuel Oil #6 | $169,477 | 39,485 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,574 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $50,450 | $222,000 |
$(-6,750.0)
(-73,271)
kWh
|
- |
$57,200
-
MMBtu
|
- | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $9,000 | $40,000 |
$4,000
43,962
kWh
|
- | - | $5,000 | - | |
03 | 2.3212: Optimize plant power factor | $6,350 | $5,500 | - |
$6,350
-
kW-mo/yr
|
- | - | - | |
04 | 2.2123: Insulate feedwater tank | $3,300 | $2,500 | - | - |
$3,300
-
MMBtu
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,960 | - |
$2,960
32,239
kWh
|
- | - | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,870 | $13,000 | - | - |
$2,870
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,000 | $550 |
$2,000
21,688
kWh
|
- | - | - | - | |
08 | 4.821: Pay bills on time to avoid late fees | $1,244 | - | - | - | - | - | $1,244 | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $1,080 | $2,000 |
$1,080
11,723
kWh
|
- | - | - | - | |
10 | 2.7135: Install occupancy sensors | $320 | $450 |
$220
2,345
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $79,574 | $286,000 |
$3,510
38,686
kWh
|
$6,450
-
kW-mo/yr
|
$63,370
-
MMBtu
|
$5,000 | $1,244 | ||
TOTAL IMPLEMENTED | $14,930 | $9,000 |
$5,180
56,272
kWh
|
$6,450
-
kW-mo/yr
|
$3,300
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs