Assessment Year | 2000 |
---|---|
Principal Product | Frozen Seafood |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
68,000
ft2
|
Annual Production | 12,350
ton
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,224 | 3,274,619 |
kWh
|
$0.060 |
Electricity Demand | $62,438 | 11,220 |
kW-mo/yr
|
$5.56 |
Natural Gas | $48,258 | 12,186 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,739 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,019 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,500 | $8,500 | - | - |
$2,500
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $2,450 | $5,700 | - |
$2,450
-
kW-mo/yr
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $2,000 | $2,400 | - | - |
$2,000
-
MMBtu
|
- | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,950 | - |
$1,950
31,067
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $970 | $150 |
$970
14,947
kWh
|
- | - | - | |
06 | 4.821: Pay bills on time to avoid late fees | $519 | - | - | - | - | $519 | |
07 | 2.7135: Install occupancy sensors | $220 | $500 |
$220
3,517
kWh
|
- | - | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $130 | - |
$130
2,052
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $10,739 | $17,250 |
$3,270
51,583
kWh
|
$2,450
-
kW-mo/yr
|
$4,500
-
MMBtu
|
$519 | ||
TOTAL IMPLEMENTED | $8,019 | $8,250 |
$3,050
48,066
kWh
|
$2,450
-
kW-mo/yr
|
$2,000
-
MMBtu
|
$519 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs