| Assessment Year | 2000 |
|---|---|
| Principal Product | Casters |
| NAICS |
n/a
|
| SIC | 3429: Hardware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
97,000
ft2
|
| Annual Production | 39,000,000
lb
|
| Production Hrs. Annual | 4,056
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,554 | 1,736,225 |
kWh
|
$0.061 |
| Electricity Demand | $28,076 | 5,057 |
kW-mo/yr
|
$5.55 |
| Electricity Fees | $807 | - |
|
- |
| Natural Gas | $27,031 | 7,897 |
MMBtu
|
$3.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,054 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,470 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,827 | $1,000 |
$7,078
114,009
kWh
|
$1,749
-
kW-mo/yr
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $4,760 | - | - | - |
$4,760
-
MMBtu
|
|
| 03 | 2.2612: Use cooling tower water instead of refrigeration | $2,838 | $13,000 |
$2,838
45,721
kWh
|
- | - | |
| 04 | 2.2623: Minimize condenser cooling water temperature | $746 | $4,000 |
$746
12,016
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $512 | $1,000 |
$382
6,155
kWh
|
$130
-
kW-mo/yr
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $371 | $100 |
$294
4,689
kWh
|
$77
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $18,054 | $19,100 |
$11,338
182,590
kWh
|
$1,956
-
kW-mo/yr
|
$4,760
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,470 | $2,100 |
$7,754
124,853
kWh
|
$1,956
-
kW-mo/yr
|
$4,760
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs