ITAC Assessment: MA0469
ITAC logo
ITAC Assessment: MA0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Braiding Machines
NAICS
n/a
SIC 3552: Textile Machinery
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 270,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,272 1,508,206
kWh
Electricity Demand $7,929 4,887
kW-mo/yr
Electricity Fees $8,915 -
Natural Gas $32,761 5,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,392 $17,000 $3,392
43,962
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $1,357 - $1,357
17,585
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,374 $1,010 $2,374
30,774
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $3,400 $12,780 $3,400
43,962
kWh
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $696 $1,495 $995
12,896
kWh
$79
-
kW-mo/yr
$(-378.0)
-
MMBtu
-
06 3.8214: Use water-based developers and finishers $527 $960 - - - $527
-
gal
07 2.4221: Install compressor air intakes in coolest locations $497 $750 $497
6,448
kWh
- - -
TOTAL RECOMMENDED $12,243 $33,995 $12,015
155,627
kWh
$79
-
kW-mo/yr
$(-378.0)
-
MMBtu
$527
-
gal
TOTAL IMPLEMENTED $8,155 $15,500 $7,628
98,769
kWh
- - $527
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs