ITAC Assessment: NL0061
ITAC logo
ITAC Assessment: NL0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product OTC Medicine
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 628,000
ft2
Annual Production 500,000,000
units
Production Hrs. Annual 6,400
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $497,741 20,346,033
kWh
Electricity Demand $742,529 36,603
kW-mo/yr
Electricity Fees $88,647 -
Natural Gas $377,385 87,798
MMBtu
Waste Disposal Costs
Water Usage $62,394 21,766
Tgal
Water Disposal $48,826 21,766
Tgal
TOTAL YEARLY COSTS $1,817,522
RECOMMENDED SAVINGS* $34,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,602

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4155: Meter waste water $9,914 $580 - - $9,914
-
Tgal
- -
02 2.3137: Use power during off-peak periods $9,080 $70 - $9,080
-
kW-mo/yr
- - -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,939 $70 $2,314
94,448
kWh
$2,625
-
kW-mo/yr
- - -
04 3.4155: Meter waste water $3,714 $580 - - $3,714
-
Tgal
- -
05 3.5311: Recover and reuse waste material $3,432 $3,500 - - - $840 $2,592
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,556 $2,500 $2,216
90,462
kWh
- - $(-560.0) $(-100.0)
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $967 $1,650 $383
15,624
kWh
$584
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $595 $1,289 $595
24,284
kWh
- - - -
TOTAL RECOMMENDED $34,197 $10,239 $5,508
224,818
kWh
$12,289
-
kW-mo/yr
$13,628
-
Tgal
$280 $2,492
TOTAL IMPLEMENTED $19,602 $7,429 $5,125
209,194
kWh
$11,705
-
kW-mo/yr
- $280 $2,492
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs