ITAC Assessment: AR0019
ITAC logo
ITAC Assessment: AR0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Inner Tubes & Bladders
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 173
Plant Area 200,000
ft2
Annual Production 15,826,559
lb
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $834,889 11,629,250
kWh
Natural Gas $264,498 88,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,832 $450 $9,832
136,870
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,270 $1,996 $4,270
59,496
kWh
-
03 2.2135: Repair and eliminate steam leaks $8,858 $2,200 - $8,858
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $15,987 $1,177 $15,987
222,743
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $29,704 - $29,704
-
kWh
-
06 2.7232: Replace existing hvac unit with high efficiency model $22,243 $47,000 $22,243
309,789
kWh
-
TOTAL RECOMMENDED $90,894 $52,823 $82,036
728,898
kWh
$8,858
-
MMBtu
TOTAL IMPLEMENTED $38,947 $5,823 $30,089
419,109
kWh
$8,858
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs