ITAC Assessment: IA0448
ITAC logo
ITAC Assessment: IA0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product printed paper
NAICS 323120: Support Activities for Printing
SIC 2761: Manifold Business Forms
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 150,000
ft2
Annual Production 72,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $556,735 7,852,754
kWh
Electricity Demand $110,431 21,024
kW-mo/yr
Natural Gas $79,978 7,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $5,064 $560 $4,544
62,903
kWh
$520
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $21,840 $1,000 - - $21,840
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,986 $50 $1,712
23,712
kWh
$274
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,736 $1,440 $10,118
140,144
kWh
$1,618
-
kW-mo/yr
-
05 2.7314: Reduce ventilation air $1,274 $2,000 $1,274
17,644
kWh
- -
06 2.2113: Repair or replace steam traps $2,798 $800 - - $2,798
-
MMBtu
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $371 $1,000 - - $371
-
MMBtu
08 2.2437: Recover waste heat from equipment $5,763 $2,360 - - $5,763
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,501 $6,360 $7,330
101,525
kWh
$1,171
-
kW-mo/yr
-
TOTAL RECOMMENDED $59,333 $15,570 $24,978
345,928
kWh
$3,583
-
kW-mo/yr
$30,772
-
MMBtu
TOTAL IMPLEMENTED $49,939 $10,160 $21,992
304,572
kWh
$3,309
-
kW-mo/yr
$24,638
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs