| Assessment Year | 2000 |
|---|---|
| Principal Product | Corrugated Cardboard |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $50 M to 100M |
| # of Employees | 68 |
| Plant Area |
140,300
ft2
|
| Annual Production | 1,500,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $266,940 | 4,633,060 |
kWh
|
$0.058 |
| Electricity Demand | $59,605 | 13,304 |
kW-mo/yr
|
$4.48 |
| Electricity Fees | $10,101 | - |
|
- |
| Natural Gas | $273,089 | 68,544 |
MMBtu
|
$3.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,526 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.6192: Use a less expensive method of waste removal | $34,550 | $50,000 | - | - | - |
$39,000
-
Tgal
|
$550
-
Tgal
|
$(-5,000.0) | |
| 02 | 2.3212: Optimize plant power factor | $4,076 | $4,125 | - |
$4,076
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,682 | $20,325 |
$2,682
53,048
kWh
|
- | - | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $845 | $528 |
$845
16,706
kWh
|
- | - | - | - | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $605 | $400 | - | - |
$605
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $42,758 | $75,378 |
$3,527
69,754
kWh
|
$4,076
-
kW-mo/yr
|
$605
-
MMBtu
|
$39,000
-
Tgal
|
$550
-
Tgal
|
$(-5,000.0) | ||
| TOTAL IMPLEMENTED | $5,526 | $5,053 |
$845
16,706
kWh
|
$4,076
-
kW-mo/yr
|
$605
-
MMBtu
|
- | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs