ITAC Assessment: MA0465
ITAC logo
ITAC Assessment: MA0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Corrugated Cardboard
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 140,300
ft2
Annual Production 1,500,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,940 4,633,060
kWh
Electricity Demand $59,605 13,304
kW-mo/yr
Electricity Fees $10,101 -
Natural Gas $273,089 68,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings By-product Production Savings
01 3.6192: Use a less expensive method of waste removal $34,550 $50,000 - - - $39,000
-
Tgal
$550
-
Tgal
$(-5,000.0)
02 2.3212: Optimize plant power factor $4,076 $4,125 - $4,076
-
kW-mo/yr
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,682 $20,325 $2,682
53,048
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $845 $528 $845
16,706
kWh
- - - - -
05 2.2136: Install / repair insulation on steam lines $605 $400 - - $605
-
MMBtu
- - -
TOTAL RECOMMENDED $42,758 $75,378 $3,527
69,754
kWh
$4,076
-
kW-mo/yr
$605
-
MMBtu
$39,000
-
Tgal
$550
-
Tgal
$(-5,000.0)
TOTAL IMPLEMENTED $5,526 $5,053 $845
16,706
kWh
$4,076
-
kW-mo/yr
$605
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs