ITAC Assessment: MA0464
ITAC logo
ITAC Assessment: MA0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Stationary Products
NAICS
n/a
SIC 2678: Stationery, Tablets, and Related Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 350,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,364 1,073,857
kWh
Natural Gas $2,291 668
MMBtu
Other Energy $38,318 4,749
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.1392: Replace purchased steam with other energy source $15,077 $36,000 - $(-25,812.0)
-
MMBtu
$40,889
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $193 - $193
2,345
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $145 $440 $145
1,758
kWh
- -
TOTAL RECOMMENDED $15,415 $36,440 $338
4,103
kWh
$(-25,812.0)
-
MMBtu
$40,889
-
MMBtu
TOTAL IMPLEMENTED $338 $440 $338
4,103
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs