ITAC Assessment: MA0463
ITAC logo
ITAC Assessment: MA0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Heat treating and brazing
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 22,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,280
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $421,228 4,514,068
kWh
Electricity Demand $27,056 8,582
kW-mo/yr
Natural Gas $8,489 1,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $203,441 $1,320,000 $275,306
3,086,753
kWh
$10,178
-
kW-mo/yr
$(-82,043.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,420 $120,000 $33,982
381,008
kWh
$1,593
-
kW-mo/yr
$(-10,155.0)
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,123 $12,075 $9,123
102,286
kWh
- -
04 2.3212: Optimize plant power factor $3,291 $9,600 $3,291
36,928
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,745 $4,317 $2,745
30,774
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $240 $420 $240
2,638
kWh
- -
TOTAL RECOMMENDED $244,260 $1,466,412 $324,687
3,640,387
kWh
$11,771
-
kW-mo/yr
$(-92,198.0)
-
MMBtu
TOTAL IMPLEMENTED $28,405 $124,737 $36,967
414,420
kWh
$1,593
-
kW-mo/yr
$(-10,155.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs