Assessment Year | 2000 |
---|---|
Principal Product | Heat treating and brazing |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 56 |
Plant Area |
22,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,280
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $421,228 | 4,514,068 |
kWh
|
$0.093 |
Electricity Demand | $27,056 | 8,582 |
kW-mo/yr
|
$3.15 |
Natural Gas | $8,489 | 1,362 |
MMBtu
|
$6.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $244,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,405 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $203,441 | $1,320,000 |
$275,306
3,086,753
kWh
|
$10,178
-
kW-mo/yr
|
$(-82,043.0)
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,420 | $120,000 |
$33,982
381,008
kWh
|
$1,593
-
kW-mo/yr
|
$(-10,155.0)
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,123 | $12,075 |
$9,123
102,286
kWh
|
- | - | |
04 | 2.3212: Optimize plant power factor | $3,291 | $9,600 |
$3,291
36,928
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,745 | $4,317 |
$2,745
30,774
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $240 | $420 |
$240
2,638
kWh
|
- | - | |
TOTAL RECOMMENDED | $244,260 | $1,466,412 |
$324,687
3,640,387
kWh
|
$11,771
-
kW-mo/yr
|
$(-92,198.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,405 | $124,737 |
$36,967
414,420
kWh
|
$1,593
-
kW-mo/yr
|
$(-10,155.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs