*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product foam tape, decorative metal laminates, drawer inserts
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 110,000
ft2
Annual Production 5,812
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,482 1,599,062
kWh
Electricity Demand $33,850 6,642
kW-mo/yr
Electricity Fees $13,278 -
Natural Gas $108,845 17,337
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $65,104 $361,250 $31,564
497,362
kWh
$14,680
-
kW-mo/yr
$38,860
-
MMBtu
$(-20,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,147 $6,075 $2,288
36,049
kWh
$859
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,455 $80 $1,786
28,136
kWh
$669
-
kW-mo/yr
- -
04 3.3132: Use reverse osmosis to concentrate material $1,558 $5,000 $(-112.0)
(-1,758)
kWh
- $2,405
-
MMBtu
$(-735.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $837 $1,976 $837
13,189
kWh
- - -
06 2.7124: Make a practice of turning off lights when not needed $558 - $558
8,792
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $316 $1,425 $316
4,982
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $186 $880 $186
2,931
kWh
- - -
TOTAL RECOMMENDED $74,161 $376,686 $37,423
589,683
kWh
$16,208
-
kW-mo/yr
$41,265
-
MMBtu
$(-20,735.0)
TOTAL IMPLEMENTED $4,887 $6,505 $2,548
40,152
kWh
$669
-
kW-mo/yr
$2,405
-
MMBtu
$(-735.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs