ITAC Assessment: AM0127
ITAC logo
ITAC Assessment: AM0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HYDRAULIC POWER PRODUCTS
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 84,200
pieces
Production Hrs. Annual 4,016
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,685 1,756,741
kWh
Natural Gas $10,889 1,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $317 $303 $317
5,569
kWh
-
02 2.2437: Recover waste heat from equipment $1,190 $655 - $1,190
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,046 $1,160 - $1,046
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $290 $260 $290
3,517
kWh
-
05 2.7261: Install timers and/or thermostats $205 - $75
2,931
kWh
$130
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $115 $75 $115
4,396
kWh
-
TOTAL RECOMMENDED $3,163 $2,453 $797
16,413
kWh
$2,366
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs