ITAC Assessment: MA0446
ITAC logo
ITAC Assessment: MA0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Dimensional Measurement Instrumentation
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 143,300
ft2
Annual Production 0
units
Production Hrs. Annual 6,846
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,587 4,267,585
kWh
Electricity Demand $36,817 11,097
kW-mo/yr
Electricity Fees $4,117 -
Natural Gas $37,595 7,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,897 $36,700 $44,710
731,243
kWh
$3,388
-
kW-mo/yr
$(-17,201.0)
-
MMBtu
-
02 2.2511: Insulate bare equipment $30,690 $820 $30,690
499,707
kWh
- - -
03 3.4114: Replace city water with recycled water via cooling tower $14,463 $20,800 $6,433
105,217
kWh
$382
-
kW-mo/yr
- $7,648
-
Tgal
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,237 $3,575 $1,075
17,585
kWh
- $8,162
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,234 $12,279 $3,008
49,238
kWh
$226
-
kW-mo/yr
- -
06 2.7311: Ventilation system to shut off when room is not in use $2,849 - $559
9,086
kWh
- $2,290
-
MMBtu
-
07 2.7229: Air condition only space necessary $1,137 $2,670 - - $1,137
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $930 $4,225 $770
12,603
kWh
$160
-
kW-mo/yr
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $718 $2,000 $1,004
16,413
kWh
$76
-
kW-mo/yr
$(-362.0)
-
MMBtu
-
10 2.4221: Install compressor air intakes in coolest locations $638 $300 $638
7,913
kWh
- - -
TOTAL RECOMMENDED $94,793 $83,369 $88,887
1,449,005
kWh
$4,232
-
kW-mo/yr
$(-5,974.0)
-
MMBtu
$7,648
-
Tgal
TOTAL IMPLEMENTED $28,324 $27,345 $8,705
139,801
kWh
$382
-
kW-mo/yr
$11,589
-
MMBtu
$7,648
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs