ITAC Assessment: MA0444
ITAC logo
ITAC Assessment: MA0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Thick Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 62,000
ft2
Annual Production 5,265,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,372 2,526,378
kWh
Electricity Demand $42,251 7,425
kW-mo/yr
Natural Gas $2,713 198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,858 - $1,858
28,722
kWh
- -
02 2.3212: Optimize plant power factor $303 $117 $303
4,689
kWh
- -
03 2.7135: Install occupancy sensors $322 $248 $322
4,982
kWh
- -
04 2.4131: Size electric motors for peak operating efficiency $879 $4,225 $723
11,137
kWh
$156
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $114 $470 $114
1,758
kWh
- -
06 4.454: Modify startup/shutdown times $3,766 - - $7,463
-
kW-mo/yr
$(-3,697.0)
TOTAL RECOMMENDED $7,242 $5,060 $3,320
51,288
kWh
$7,619
-
kW-mo/yr
$(-3,697.0)
TOTAL IMPLEMENTED $2,483 $365 $2,483
38,393
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs