ITAC Assessment: MA0439
ITAC logo
ITAC Assessment: MA0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Steel Mill Equipment
NAICS
n/a
SIC 3457:
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area 250,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $482,750 7,486,518
kWh
Electricity Demand $59,369 16,355
kW-mo/yr
Natural Gas $15,534 2,669
MMBtu
Fuel Oil #4 $92,674 27,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings By-product Production Savings
01 4.631: Install an uninteruptable power supply $120,000 $24,000 - - - - $120,000
02 2.6218: Turn off equipment when not in use $8,636 $1,360 - - $1,235
-
MMBtu
$7,401
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,629 $500 - - - $4,629
-
MMBtu
-
04 2.3212: Optimize plant power factor $4,578 $10,705 - $4,578
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,038 $1,295 $1,038
17,292
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,116 $3,400 $1,116
18,757
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $668 $1,244 $668
11,137
kWh
- - - -
TOTAL RECOMMENDED $140,665 $42,504 $2,822
47,186
kWh
$4,578
-
kW-mo/yr
$1,235
-
MMBtu
$12,030
-
MMBtu
$120,000
TOTAL IMPLEMENTED $14,303 $3,155 $1,038
17,292
kWh
- $1,235
-
MMBtu
$12,030
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs