Assessment Year | 1999 |
---|---|
Principal Product | valves |
NAICS |
n/a
|
SIC | 3491: Industrial Valves |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
130,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,506 | 3,693,435 |
kWh
|
$0.059 |
Electricity Demand | $68,377 | 8,935 |
kW-mo/yr
|
$7.65 |
Natural Gas | $58,243 | 11,793 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,664 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $17,316 | $3,000 | - | - |
$17,316
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $8,292 | $1,892 | - | - |
$8,292
-
MMBtu
|
|
03 | 2.4224: Upgrade controls on compressors | $6,214 | $400 |
$5,492
91,442
kWh
|
$722
-
kW-mo/yr
|
- | |
04 | 2.2692: Use outside cold water source as a supply of cooling water | $2,225 | $300 |
$1,989
33,118
kWh
|
$236
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,451 | $2,445 |
$1,451
24,033
kWh
|
- | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $774 | - |
$774
12,896
kWh
|
- | - | |
TOTAL RECOMMENDED | $36,272 | $8,037 |
$9,706
161,489
kWh
|
$958
-
kW-mo/yr
|
$25,608
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,664 | $3,145 |
$9,706
161,489
kWh
|
$958
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs