ITAC Assessment: MA0437
ITAC logo
ITAC Assessment: MA0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,506 3,693,435
kWh
Electricity Demand $68,377 8,935
kW-mo/yr
Natural Gas $58,243 11,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $17,316 $3,000 - - $17,316
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $8,292 $1,892 - - $8,292
-
MMBtu
03 2.4224: Upgrade controls on compressors $6,214 $400 $5,492
91,442
kWh
$722
-
kW-mo/yr
-
04 2.2692: Use outside cold water source as a supply of cooling water $2,225 $300 $1,989
33,118
kWh
$236
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,451 $2,445 $1,451
24,033
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $774 - $774
12,896
kWh
- -
TOTAL RECOMMENDED $36,272 $8,037 $9,706
161,489
kWh
$958
-
kW-mo/yr
$25,608
-
MMBtu
TOTAL IMPLEMENTED $10,664 $3,145 $9,706
161,489
kWh
$958
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs