Assessment Year | 1998 |
---|---|
Principal Product | Rubber Boots |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 150 |
Plant Area |
225,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,765 | 4,742,380 |
kWh
|
$0.070 |
Electricity Demand | $153,112 | 11,796 |
kW-mo/yr
|
$12.98 |
LPG | $13,513 | 1,250 |
MMBtu
|
$10.81 |
Fuel Oil #2 | $9,290 | 1,725 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,724 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,634 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $5,357 | $300 | - | - |
$3,583
-
MMBtu
|
$1,774
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,264 | - |
$1,264
15,240
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $711 | $1,840 |
$711
8,499
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,777 | $10,080 |
$2,259
26,964
kWh
|
$518
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,070 | $27,413 |
$4,354
52,169
kWh
|
$2,716
-
kW-mo/yr
|
- | - | - | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $56,116 | $21,247 |
$50,762
606,975
kWh
|
$8,838
-
kW-mo/yr
|
- | - |
$(-3,484.0)
-
Tgal
|
|
07 | 2.7124: Make a practice of turning off lights when not needed | $2,518 | $800 |
$2,518
30,188
kWh
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,048 | $75 |
$1,048
12,603
kWh
|
- | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,863 | $15,850 |
$7,863
94,080
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $84,724 | $77,605 |
$70,779
846,718
kWh
|
$12,072
-
kW-mo/yr
|
$3,583
-
MMBtu
|
$1,774
-
MMBtu
|
$(-3,484.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $9,634 | $3,015 |
$4,277
51,290
kWh
|
- |
$3,583
-
MMBtu
|
$1,774
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs