ITAC Assessment: MA0430
ITAC logo
ITAC Assessment: MA0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Rubber Boots
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 225,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,765 4,742,380
kWh
Electricity Demand $153,112 11,796
kW-mo/yr
LPG $13,513 1,250
MMBtu
Fuel Oil #2 $9,290 1,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings
01 2.2211: Use optimum temperature $5,357 $300 - - $3,583
-
MMBtu
$1,774
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,264 - $1,264
15,240
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $711 $1,840 $711
8,499
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,777 $10,080 $2,259
26,964
kWh
$518
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,070 $27,413 $4,354
52,169
kWh
$2,716
-
kW-mo/yr
- - -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $56,116 $21,247 $50,762
606,975
kWh
$8,838
-
kW-mo/yr
- - $(-3,484.0)
-
Tgal
07 2.7124: Make a practice of turning off lights when not needed $2,518 $800 $2,518
30,188
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,048 $75 $1,048
12,603
kWh
- - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,863 $15,850 $7,863
94,080
kWh
- - - -
TOTAL RECOMMENDED $84,724 $77,605 $70,779
846,718
kWh
$12,072
-
kW-mo/yr
$3,583
-
MMBtu
$1,774
-
MMBtu
$(-3,484.0)
-
Tgal
TOTAL IMPLEMENTED $9,634 $3,015 $4,277
51,290
kWh
- $3,583
-
MMBtu
$1,774
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs