Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $196,870 | 3,312,400 |
kWh
|
$0.059 |
| Electricity Demand | $75,374 | 8,684 |
kW-mo/yr
|
$8.68 |
| Natural Gas | $73,926 | 5,392 |
MMBtu
|
$13.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $114,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4155: Meter waste water | $2,223 | $3,650 | - | - |
$2,223
-
Tgal
|
- | |
| 02 | 4.111: Add equipment/ operators to reduce production bottleneck | $69,120 | $150,000 | - | - | - | $69,120 | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,387 | $3 |
$4,387
73,119
kWh
|
- | - | - | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $11,384 | $143 |
$11,384
189,696
kWh
|
- | - | - | |
| 05 | 2.6218: Turn off equipment when not in use | $22,932 | $2 |
$18,196
303,264
kWh
|
$4,736
-
kW-mo/yr
|
- | - | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,432 | $6 |
$1,432
23,861
kWh
|
- | - | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $2,831 | $1,879 |
$2,246
37,440
kWh
|
$585
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $114,309 | $155,683 |
$37,645
627,380
kWh
|
$5,321
-
kW-mo/yr
|
$2,223
-
Tgal
|
$69,120 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs