Assessment Year | 1998 |
---|---|
Principal Product | Tempered and Annealed Glas |
NAICS |
n/a
|
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $5 M to 10M |
# of Employees | 54 |
Plant Area |
89,000
ft2
|
Annual Production | 3,250
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $191,488 | 2,957,796 |
kWh
|
$0.065 |
Electricity Demand | $24,514 | 2,604 |
kW-mo/yr
|
$9.41 |
Natural Gas | $24,793 | 3,704 |
MMBtu
|
$6.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $301 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $46,132 | $1,000,000 |
$66,091
1,146,835
kWh
|
- |
$(-19,959.0)
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,390 | $35,000 |
$11,390
180,539
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,415 | $7,983 |
$1,035
16,413
kWh
|
$380
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $163 | $261 |
$163
2,638
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $138 | - |
$138
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $59,238 | $1,043,244 |
$78,817
1,348,770
kWh
|
$380
-
kW-mo/yr
|
$(-19,959.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $301 | $261 |
$301
4,983
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs