ITAC Assessment: MA0418
ITAC logo
ITAC Assessment: MA0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Tempered and Annealed Glas
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area 89,000
ft2
Annual Production 3,250
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,488 2,957,796
kWh
Electricity Demand $24,514 2,604
kW-mo/yr
Natural Gas $24,793 3,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,132 $1,000,000 $66,091
1,146,835
kWh
- $(-19,959.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,390 $35,000 $11,390
180,539
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,415 $7,983 $1,035
16,413
kWh
$380
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $163 $261 $163
2,638
kWh
- -
05 2.6218: Turn off equipment when not in use $138 - $138
2,345
kWh
- -
TOTAL RECOMMENDED $59,238 $1,043,244 $78,817
1,348,770
kWh
$380
-
kW-mo/yr
$(-19,959.0)
-
MMBtu
TOTAL IMPLEMENTED $301 $261 $301
4,983
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs