Assessment Year | 1997 |
---|---|
Principal Product | Printed Circuit Boards an Insulated Fiberglass Boards |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
100,000
ft2
|
Annual Production | 12,000
thousand feet
|
Production Hrs. Annual | 7,140
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $392,282 | 5,848,769 |
kWh
|
$0.067 |
Electricity Demand | $162,387 | 13,111 |
kW-mo/yr
|
$12.39 |
LPG | $325,892 | 60,456 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,724 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $217,449 | $140,000 |
$109,213
1,655,041
kWh
|
$137,826
-
kW-mo/yr
|
$(-29,590.0)
-
MMBtu
|
- | - | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $61,092 | $16,597 |
$2,592
39,273
kWh
|
- | - | - |
$58,500
-
Tgal
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,628 | $6,075 |
$7,628
115,475
kWh
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,721 | $4,925 |
$4,721
71,219
kWh
|
- | - | - | - | |
05 | 2.3212: Optimize plant power factor | $2,577 | $4,275 | - | - | - | $2,577 | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,257 | $200 |
$1,257
19,050
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $294,724 | $172,072 |
$125,411
1,900,058
kWh
|
$137,826
-
kW-mo/yr
|
$(-29,590.0)
-
MMBtu
|
$2,577 |
$58,500
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs