ITAC Assessment: MA0402
ITAC logo
ITAC Assessment: MA0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed Circuit Boards an Insulated Fiberglass Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 7,140
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,282 5,848,769
kWh
Electricity Demand $162,387 13,111
kW-mo/yr
LPG $325,892 60,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $217,449 $140,000 $109,213
1,655,041
kWh
$137,826
-
kW-mo/yr
$(-29,590.0)
-
MMBtu
- -
02 3.4114: Replace city water with recycled water via cooling tower $61,092 $16,597 $2,592
39,273
kWh
- - - $58,500
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,628 $6,075 $7,628
115,475
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,721 $4,925 $4,721
71,219
kWh
- - - -
05 2.3212: Optimize plant power factor $2,577 $4,275 - - - $2,577 -
06 2.4221: Install compressor air intakes in coolest locations $1,257 $200 $1,257
19,050
kWh
- - - -
TOTAL RECOMMENDED $294,724 $172,072 $125,411
1,900,058
kWh
$137,826
-
kW-mo/yr
$(-29,590.0)
-
MMBtu
$2,577 $58,500
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs