Assessment Year | 1992 |
---|---|
Principal Product | STEEL PROCESSING |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 122 |
Plant Area |
n/a
|
Annual Production | 500,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $361,504 | 8,054,514 |
kWh
|
$0.045 |
Natural Gas | $213,073 | 50,992 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,664 | $8,600 |
$6,664
-
kWh
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,724 | - |
$1,724
73,857
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $5,415 | $3,000 | - |
$5,415
-
MMBtu
|
- | - | |
04 | 3.4155: Meter waste water | $14,996 | $300,000 | - | - | - | $14,996 | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $6,143 | $15,000 | - | - |
$6,143
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,942 | $326,600 |
$8,388
73,857
kWh
|
$5,415
-
MMBtu
|
$6,143
-
MMBtu
|
$14,996 | ||
TOTAL IMPLEMENTED | $23,384 | $308,600 |
$8,388
73,857
kWh
|
- | - | $14,996 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs