ITAC Assessment: MA0398
ITAC logo
ITAC Assessment: MA0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Specialized Industrial Machinery, NFC
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 26,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,810
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,424 505,569
kWh
Electricity Demand $15,238 2,881
kW-mo/yr
Natural Gas $25,931 2,955
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,098 $34,200 $5,146
73,857
kWh
$952
-
kW-mo/yr
- -
02 3.4111: Use closed cycle process to minimize waste water production $2,759 $10,560 $(-169.0)
(-1,758)
kWh
- - $2,928
-
Tgal
03 2.4221: Install compressor air intakes in coolest locations $1,450 $384 $1,450
20,809
kWh
- - -
04 2.8121: Apply for tax-free status for energy purchases $1,067 - - - $1,067 -
05 4.821: Pay bills on time to avoid late fees $346 - - - $346 -
TOTAL RECOMMENDED $11,720 $45,144 $6,427
92,908
kWh
$952
-
kW-mo/yr
$1,413 $2,928
-
Tgal
TOTAL IMPLEMENTED $2,863 $384 $1,450
20,809
kWh
- $1,413 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs