ITAC Assessment: MA0396
ITAC logo
ITAC Assessment: MA0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product high quality converted papers
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 310,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,467 5,038,101
kWh
Electricity Demand $148,862 13,975
kW-mo/yr
Natural Gas $13,984 3,024
MMBtu
Fuel Oil #2 $124,228 24,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 3.4145: Use magnetic technology to treat water $7,580 $9,347 - - - - $3,790
-
gal
$3,790
-
lb
02 2.1223: Install smaller boiler (increase high fire duty cycle) $5,492 $11,700 - - $2,746
-
MMBtu
$2,746
-
MMBtu
- -
03 2.2612: Use cooling tower water instead of refrigeration $4,207 $14,329 $4,207
67,702
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,606 $75 $2,606
44,842
kWh
- - - - -
05 2.6218: Turn off equipment when not in use $1,409 $60 $947
15,240
kWh
$462
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $819 $102 $819
13,189
kWh
- - - - -
07 2.6218: Turn off equipment when not in use $182 $132 $182
2,931
kWh
- - - - -
TOTAL RECOMMENDED $22,295 $35,745 $8,761
143,904
kWh
$462
-
kW-mo/yr
$2,746
-
MMBtu
$2,746
-
MMBtu
$3,790
-
gal
$3,790
-
lb
TOTAL IMPLEMENTED $9,507 $11,835 $3,553
60,082
kWh
$462
-
kW-mo/yr
$2,746
-
MMBtu
$2,746
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs