ITAC Assessment: DL0068
ITAC logo
ITAC Assessment: DL0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Motor Vehicles
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range greater than $500
M
# of Employees 30
Plant Area 1,800,000
ft2
Annual Production 999,999,999
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $960,000 12,000,000
kWh
Natural Gas $226,270 18,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $554,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $186,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $14,500 $200 $14,500
181,000
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,200 $3,200 $15,200
190,800
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $51,300 $12,000 $51,300
641,700
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $182,000 $17,000 $182,000
2,280,000
kWh
-
05 2.1231: Establish burner maintenance schedule for boilers $21,659 $4,300 - $21,659
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $51,400 $10,000 - $51,400
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $3,315 $15,000 - $3,315
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $183,000 $600,000 $183,000
2,290,000
kWh
-
09 2.7124: Make a practice of turning off lights when not needed $32,300 $200 $32,300
404,100
kWh
-
TOTAL RECOMMENDED $554,674 $661,900 $478,300
5,987,600
kWh
$76,374
-
MMBtu
TOTAL IMPLEMENTED $186,359 $29,900 $113,300
1,417,600
kWh
$73,059
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs