ITAC Assessment: MA0817
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 3
Plant Area 14,200
ft2
Annual Production 383,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,025 529,760
kWh
Electricity Demand $13,584 1,252
kW-mo/yr
Fuel Oil #2 $17,181 1,108
MMBtu
Waste Disposal Costs
Water Usage $124 11
Tgal
TOTAL YEARLY COSTS $102,914
RECOMMENDED SAVINGS* $6,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2622: Replace existing chiller with high efficiency model $2,919 $5,650 $(-2,027.0)
(-14,904)
kWh
$4,946
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $1,876 $50 - $1,876
-
MMBtu
03 3.1191: Change procedures / equipment / operating conditions $1,042 $100 $1,042
7,698
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $387 $1,503 $387
2,849
kWh
-
TOTAL RECOMMENDED $6,224 $7,303 $(-598.0)
(-4,357)
kWh
$6,822
-
MMBtu
TOTAL IMPLEMENTED $5,182 $7,203 $(-1,640.0)
(-12,055)
kWh
$6,822
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs