| Assessment Year | 2020 |
|---|---|
| Principal Product | Treated wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $500 k to 1M |
| # of Employees | 3 |
| Plant Area |
14,200
ft2
|
| Annual Production | 383,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $72,025 | 529,760 |
kWh
|
$0.14 | |
| Electricity Demand | $13,584 | 1,252 |
kW-mo/yr
|
$10.85 | |
| Fuel Oil #2 | $17,181 | 1,108 |
MMBtu
|
$15.51 | |
| Waste Disposal Costs | |||||
| Water Usage | $124 | 11 |
Tgal
|
$11.63 | |
| TOTAL YEARLY COSTS | $102,914 | ||||
| RECOMMENDED SAVINGS* | $6,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $5,182 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $2,919 | $5,650 |
$(-2,027.0)
(-14,904)
kWh
|
$4,946
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,876 | $50 | - |
$1,876
-
MMBtu
|
|
| 03 | 3.1191: Change procedures / equipment / operating conditions | $1,042 | $100 |
$1,042
7,698
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $387 | $1,503 |
$387
2,849
kWh
|
- | |
| TOTAL RECOMMENDED | $6,224 | $7,303 |
$(-598.0)
(-4,357)
kWh
|
$6,822
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,182 | $7,203 |
$(-1,640.0)
(-12,055)
kWh
|
$6,822
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs