Assessment Year | 1997 |
---|---|
Principal Product | Pewter and Resin Figurines |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 111 |
Plant Area |
41,600
ft2
|
Annual Production | 280,000
lb
|
Production Hrs. Annual | 2,660
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,826 | 604,924 |
kWh
|
$0.051 |
Natural Gas | $25,795 | 4,398 |
MMBtu
|
$5.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $466,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.321: Optimize production lot sizes and inventories | $315,000 | - | - | - | - | $315,000 | |
02 | 4.131: Modify process to reduce material use/cost | $137,850 | $15,000 | - | - | - | $137,850 | |
03 | 2.7224: Reduce space conditioning during non-working hours | $9,089 | $3,215 | - |
$9,089
-
MMBtu
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,348 | $6,625 | - | - |
$4,348
-
lb
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $290 | $364 |
$290
5,275
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $408 | $861 |
$408
6,741
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $466,985 | $26,065 |
$698
12,016
kWh
|
$9,089
-
MMBtu
|
$4,348
-
lb
|
$452,850 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs