ITAC Assessment: MA0384
ITAC logo
ITAC Assessment: MA0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Pewter and Resin Figurines
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 111
Plant Area 41,600
ft2
Annual Production 280,000
lb
Production Hrs. Annual 2,660
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,826 604,924
kWh
Natural Gas $25,795 4,398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $466,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 4.321: Optimize production lot sizes and inventories $315,000 - - - - $315,000
02 4.131: Modify process to reduce material use/cost $137,850 $15,000 - - - $137,850
03 2.7224: Reduce space conditioning during non-working hours $9,089 $3,215 - $9,089
-
MMBtu
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,348 $6,625 - - $4,348
-
lb
-
05 2.4221: Install compressor air intakes in coolest locations $290 $364 $290
5,275
kWh
- - -
06 2.2511: Insulate bare equipment $408 $861 $408
6,741
kWh
- - -
TOTAL RECOMMENDED $466,985 $26,065 $698
12,016
kWh
$9,089
-
MMBtu
$4,348
-
lb
$452,850
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs