| Assessment Year | 2003 |
|---|---|
| Principal Product | Plastic injection molded parts and tubing |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
65,000
ft2
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $306,422 | 8,204,400 |
kWh
|
$0.037 |
| Electricity Demand | $91,530 | 13,020 |
kW-mo/yr
|
$7.03 |
| Natural Gas | $33,900 | 5,131 |
MMBtu
|
$6.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,558 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.112: Replace old machine with new automatic multi-station tool | $22,837 | $8,450 | - | - | $22,837 | |
| 02 | 2.6218: Turn off equipment when not in use | $10,820 | $9,840 |
$8,397
239,904
kWh
|
$2,423
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,940 | $9,945 |
$3,900
111,385
kWh
|
$1,040
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,738 | $3,024 |
$1,349
38,556
kWh
|
$389
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $850 | $25 |
$660
18,850
kWh
|
$190
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $743 | $1,591 |
$646
18,442
kWh
|
$97
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $390 | $262 |
$390
11,156
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $216 | $707 |
$168
4,805
kWh
|
$48
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $42,534 | $33,844 |
$15,510
443,098
kWh
|
$4,187
-
kW-mo/yr
|
$22,837 | ||
| TOTAL IMPLEMENTED | $12,558 | $12,864 |
$9,746
278,460
kWh
|
$2,812
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs