ITAC Assessment: MA0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Corrugated Cardboard
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 159
Plant Area 162,616
ft2
Annual Production 480,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,103 2,783,998
kWh
Natural Gas $107,554 26,667
MMBtu
LPG $18,262 2,122
MMBtu
Fuel Oil #2 $44,826 10,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings
01 2.2511: Insulate bare equipment $6,197 $3,178 - $3,983
-
MMBtu
$2,214
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $413 $272 $413
7,034
kWh
- - -
03 2.2437: Recover waste heat from equipment $1,699 $1,415 $924
15,240
kWh
$498
-
MMBtu
$277
-
MMBtu
-
04 2.7231: Use radiant heater for spot heating $2,379 $3,200 - $1,529
-
MMBtu
$850
-
MMBtu
-
05 3.4145: Use magnetic technology to treat water $3,300 $9,235 - - - $3,300
-
gal
TOTAL RECOMMENDED $13,988 $17,300 $1,337
22,274
kWh
$6,010
-
MMBtu
$3,341
-
MMBtu
$3,300
-
gal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs