ITAC Assessment: MA0374
ITAC logo
ITAC Assessment: MA0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic color concentrates
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 60,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,303 4,073,564
kWh
Electricity Demand $103,667 23,911
kW-mo/yr
Natural Gas $50,782 8,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $5,688 $2,183 - $5,688
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $3,185 $1,720 - $3,185
-
MMBtu
-
03 3.4145: Use magnetic technology to treat water $1,575 $11,399 - - $1,575
-
gal
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $352 $130 $352
7,327
kWh
- -
TOTAL RECOMMENDED $10,800 $15,432 $352
7,327
kWh
$8,873
-
MMBtu
$1,575
-
gal
TOTAL IMPLEMENTED $8,873 $3,903 - $8,873
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs