ITAC Assessment: MA0367
ITAC logo
ITAC Assessment: MA0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Prefabricated houses
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 26,000
ft2
Annual Production 180
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,232 283,705
kWh
Fuel Oil #2 $22,155 3,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.6232: Install set-back timers $1,053 - $1,053
14,068
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,828 $11,453 $2,828
33,118
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,825 - $1,825
28,722
kWh
-
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,880 $600 - $2,880
-
lb
TOTAL RECOMMENDED $8,586 $12,053 $5,706
75,908
kWh
$2,880
-
lb
TOTAL IMPLEMENTED $4,705 $600 $1,825
28,722
kWh
$2,880
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs