ITAC Assessment: MA0365
ITAC logo
ITAC Assessment: MA0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Saw Blades
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 65,792
ft2
Annual Production 4,200
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,054 2,443,435
kWh
Electricity Demand $158,071 10,120
kW-mo/yr
Electricity Fees $72,874 -
Natural Gas $26,337 4,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $15,805 $20,000 $15,805
101,993
kWh
- - -
02 3.1161: Eliminate/reduce an operation $9,443 - $9,443
92,321
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $4,539 $840 $4,539
67,995
kWh
- - -
04 2.8113: Purchase gas directly from a contract gas supplier $4,290 - - - - $4,290
05 2.2136: Install / repair insulation on steam lines $2,173 $876 - $2,173
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,330 $640 $1,330
19,930
kWh
- - -
07 2.8112: Combine utility meters $420 - - - - $420
08 3.5316: Contract a wood pallet recycling company $345 - - - $345
-
lb
-
TOTAL RECOMMENDED $38,345 $22,356 $31,117
282,239
kWh
$2,173
-
MMBtu
$345
-
lb
$4,710
TOTAL IMPLEMENTED $36,670 $21,716 $29,787
262,309
kWh
$2,173
-
MMBtu
- $4,710
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings