Assessment Year | 1996 |
---|---|
Principal Product | Saw Blades |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
65,792
ft2
|
Annual Production | 4,200
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,054 | 2,443,435 |
kWh
|
$0.034 |
Electricity Demand | $158,071 | 10,120 |
kW-mo/yr
|
$15.62 |
Electricity Fees | $72,874 | - |
|
- |
Natural Gas | $26,337 | 4,131 |
MMBtu
|
$6.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,670 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $15,805 | $20,000 |
$15,805
101,993
kWh
|
- | - | - | |
02 | 3.1161: Eliminate/reduce an operation | $9,443 | - |
$9,443
92,321
kWh
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $4,539 | $840 |
$4,539
67,995
kWh
|
- | - | - | |
04 | 2.8113: Purchase gas directly from a contract gas supplier | $4,290 | - | - | - | - | $4,290 | |
05 | 2.2136: Install / repair insulation on steam lines | $2,173 | $876 | - |
$2,173
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,330 | $640 |
$1,330
19,930
kWh
|
- | - | - | |
07 | 2.8112: Combine utility meters | $420 | - | - | - | - | $420 | |
08 | 3.5316: Contract a wood pallet recycling company | $345 | - | - | - |
$345
-
lb
|
- | |
TOTAL RECOMMENDED | $38,345 | $22,356 |
$31,117
282,239
kWh
|
$2,173
-
MMBtu
|
$345
-
lb
|
$4,710 | ||
TOTAL IMPLEMENTED | $36,670 | $21,716 |
$29,787
262,309
kWh
|
$2,173
-
MMBtu
|
- | $4,710 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs