| Assessment Year | 1995 |
|---|---|
| Principal Product | Extruded brush fiber |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
110,000
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 6,048
hrs
|
| Location (State) | Vermont |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $922,997 | 12,249,707 |
kWh
|
$0.075 |
| Natural Gas | $59,890 | 11,699 |
MMBtu
|
$5.12 |
| LPG | $8,285 | 788 |
MMBtu
|
$10.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,977 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $47,119 | $20,700 |
$47,119
625,440
kWh
|
- | - | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $25,737 | $27,186 |
$(-1,899.0)
(-25,205)
kWh
|
- |
$27,636
-
Tgal
|
|
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $858 | $1,700 |
$1,236
16,413
kWh
|
$(-378.0)
-
MMBtu
|
- | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $777 | $2,600 | - |
$777
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $571 | $127 |
$571
7,913
kWh
|
- | - | |
| TOTAL RECOMMENDED | $75,062 | $52,313 |
$47,027
624,561
kWh
|
$399
-
MMBtu
|
$27,636
-
Tgal
|
||
| TOTAL IMPLEMENTED | $47,977 | $22,400 |
$48,355
641,853
kWh
|
$(-378.0)
-
MMBtu
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs