Assessment Year | 1995 |
---|---|
Principal Product | Extruded brush fiber |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
110,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $922,997 | 12,249,707 |
kWh
|
$0.075 |
Natural Gas | $59,890 | 11,699 |
MMBtu
|
$5.12 |
LPG | $8,285 | 788 |
MMBtu
|
$10.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,977 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $47,119 | $20,700 |
$47,119
625,440
kWh
|
- | - | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $25,737 | $27,186 |
$(-1,899.0)
(-25,205)
kWh
|
- |
$27,636
-
Tgal
|
|
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $858 | $1,700 |
$1,236
16,413
kWh
|
$(-378.0)
-
MMBtu
|
- | |
04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $777 | $2,600 | - |
$777
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $571 | $127 |
$571
7,913
kWh
|
- | - | |
TOTAL RECOMMENDED | $75,062 | $52,313 |
$47,027
624,561
kWh
|
$399
-
MMBtu
|
$27,636
-
Tgal
|
||
TOTAL IMPLEMENTED | $47,977 | $22,400 |
$48,355
641,853
kWh
|
$(-378.0)
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs