ITAC Assessment: MA0349
ITAC logo
ITAC Assessment: MA0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Extruded brush fiber
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $922,997 12,249,707
kWh
Natural Gas $59,890 11,699
MMBtu
LPG $8,285 788
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2511: Insulate bare equipment $47,119 $20,700 $47,119
625,440
kWh
- -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $25,737 $27,186 $(-1,899.0)
(-25,205)
kWh
- $27,636
-
Tgal
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $858 $1,700 $1,236
16,413
kWh
$(-378.0)
-
MMBtu
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $777 $2,600 - $777
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $571 $127 $571
7,913
kWh
- -
TOTAL RECOMMENDED $75,062 $52,313 $47,027
624,561
kWh
$399
-
MMBtu
$27,636
-
Tgal
TOTAL IMPLEMENTED $47,977 $22,400 $48,355
641,853
kWh
$(-378.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs