ITAC Assessment: MA0348
ITAC logo
ITAC Assessment: MA0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Grey iron castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 236,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,932 1,927,315
kWh
Natural Gas $9,343 1,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $852 $127 $852
5,862
kWh
-
02 2.4314: Use synthetic lubricant $852 $300 $852
5,862
kWh
-
03 2.7135: Install occupancy sensors $642 $350 $642
4,396
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,014 $1,200 $2,014
15,240
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,011 $4,750 $1,011
7,034
kWh
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,710 $385 - $1,710
-
lb
TOTAL RECOMMENDED $7,081 $7,112 $5,371
38,394
kWh
$1,710
-
lb
TOTAL IMPLEMENTED $3,877 $6,077 $3,877
28,136
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs