ITAC Assessment: MA0344
ITAC logo
ITAC Assessment: MA0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product reflow ovens
NAICS
n/a
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 33,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 4,862
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,047 565,358
kWh
LPG $19,324 1,955
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $6,107 $2,446 $177
2,052
kWh
$5,930
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,398 $24,197 $5,398
47,479
kWh
- - - - -
03 2.4226: Use / purchase optimum sized compressor $2,909 - $2,909
32,532
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,098 $798 $1,098
9,965
kWh
- - - - -
05 2.8114: Change rate schedules or other changes in utility service $598 - - - - $598 - -
06 2.7314: Reduce ventilation air $344 - $46
586
kWh
$298
-
MMBtu
- - - -
07 3.1162: Use less wasteful packaging $22,500 - - - - - $22,500 -
08 3.2121: Convert to electrostatic powder coating $16,229 $4,500 - - - - $16,229 -
09 3.1191: Change procedures / equipment / operating conditions $11,867 $5,000 $(-1,276.0)
(-6,155)
kWh
- - - - $13,143
10 3.6192: Use a less expensive method of waste removal $1,920 - - - $1,920
-
lb
- - -
TOTAL RECOMMENDED $68,970 $36,941 $8,352
86,459
kWh
$6,228
-
MMBtu
$1,920
-
lb
$598 $38,729 $13,143
TOTAL IMPLEMENTED $4,351 $798 $4,053
43,083
kWh
$298
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs