ITAC Assessment: MA0340
ITAC logo
ITAC Assessment: MA0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product metal coating services
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 52,500
ft2
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,315 701,055
kWh
Natural Gas $126,979 15,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3137: Use power during off-peak periods $4,800 - $4,800
-
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $3,349 $200 $3,349
33,705
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $2,634 $5,995 $(-818.0)
(-9,965)
kWh
$3,452
-
MMBtu
-
04 2.8123: Pay utility bills on time $1,820 - - - $1,820
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,369 $2,464 $1,369
10,551
kWh
- -
06 2.7314: Reduce ventilation air $1,190 $3,320 - $1,190
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $753 - $753
10,844
kWh
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $612 $330 $612
6,155
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $558 $127 $558
4,689
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $356 $570 $356
2,931
kWh
- -
TOTAL RECOMMENDED $17,441 $13,006 $10,979
58,910
kWh
$4,642
-
MMBtu
$1,820
TOTAL IMPLEMENTED $14,249 $6,884 $11,239
64,186
kWh
$1,190
-
MMBtu
$1,820
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs