ITAC Assessment: MA0333
ITAC logo
ITAC Assessment: MA0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,950
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,308 1,617,526
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,356 $30,750 $33,824
337,046
kWh
$(-9,468.0)
-
MMBtu
02 2.3212: Optimize plant power factor $4,592 $9,500 $4,592
-
kWh
-
03 2.2437: Recover waste heat from equipment $4,119 $1,800 $4,119
41,032
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $588 $800 $588
5,862
kWh
-
05 2.2437: Recover waste heat from equipment $412 $461 $412
5,275
kWh
-
TOTAL RECOMMENDED $34,067 $43,311 $43,535
389,215
kWh
$(-9,468.0)
-
MMBtu
TOTAL IMPLEMENTED $5,592 $10,761 $5,592
11,137
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs