Assessment Year | 1995 |
---|---|
Principal Product | Grinding Machines |
NAICS |
n/a
|
SIC | 3541: Machine Tools, Metal Cutting Types |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
194,000
ft2
|
Annual Production | 48
pieces
|
Production Hrs. Annual | 5,300
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,710 | 3,462,192 |
kWh
|
$0.090 |
Fuel Oil #2 | $66,006 | 17,063 |
MMBtu
|
$3.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $10,539 | $750 |
$1,847
20,516
kWh
|
$8,692
-
MMBtu
|
|
02 | 2.8123: Pay utility bills on time | $6,219 | - |
$6,219
-
kWh
|
- | |
03 | 2.1231: Establish burner maintenance schedule for boilers | $5,088 | $1,950 | - |
$5,088
-
MMBtu
|
|
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,392 | - |
$4,392
-
kWh
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,663 | $9,216 |
$4,544
50,410
kWh
|
$(-881.0)
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,356 | $1,200 |
$3,356
39,273
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $2,306 | - |
$2,306
25,498
kWh
|
- | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $1,463 | $300 | - |
$1,463
-
MMBtu
|
|
09 | 2.4221: Install compressor air intakes in coolest locations | $343 | $333 |
$343
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $37,369 | $13,749 |
$23,007
139,507
kWh
|
$14,362
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,830 | $12,999 |
$21,160
118,991
kWh
|
$5,670
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs