ITAC Assessment: MA0329
ITAC logo
ITAC Assessment: MA0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Grinding Machines
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 194,000
ft2
Annual Production 48
pieces
Production Hrs. Annual 5,300
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,710 3,462,192
kWh
Fuel Oil #2 $66,006 17,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.6218: Turn off equipment when not in use $10,539 $750 $1,847
20,516
kWh
$8,692
-
MMBtu
02 2.8123: Pay utility bills on time $6,219 - $6,219
-
kWh
-
03 2.1231: Establish burner maintenance schedule for boilers $5,088 $1,950 - $5,088
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,392 - $4,392
-
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,663 $9,216 $4,544
50,410
kWh
$(-881.0)
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,356 $1,200 $3,356
39,273
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $2,306 - $2,306
25,498
kWh
-
08 2.7221: Lower temperature during the winter season and vice-versa $1,463 $300 - $1,463
-
MMBtu
09 2.4221: Install compressor air intakes in coolest locations $343 $333 $343
3,810
kWh
-
TOTAL RECOMMENDED $37,369 $13,749 $23,007
139,507
kWh
$14,362
-
MMBtu
TOTAL IMPLEMENTED $26,830 $12,999 $21,160
118,991
kWh
$5,670
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs