ITAC Assessment: MA0327
ITAC logo
ITAC Assessment: MA0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product extruded plastic sheet
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 92,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,631 3,956,917
kWh
Natural Gas $41,653 5,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,783 - $18,783
-
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,094 $90,000 $20,409
259,086
kWh
$(-2,315.0)
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,441 $36,400 $15,441
189,625
kWh
-
04 2.3134: Shift from daytime to nighttime operation $9,488 - $9,488
-
kWh
-
05 2.2625: Chill water to the highest temperature possible $4,033 - $4,033
49,531
kWh
-
06 2.4133: Use most efficient type of electric motors $4,001 $12,431 $4,001
58,030
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,226 - $2,226
28,429
kWh
-
08 2.4239: Eliminate or reduce compressed air usage $1,903 $1,500 $1,903
9,965
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,213 - $1,213
19,637
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $277 $500 $277
3,517
kWh
-
TOTAL RECOMMENDED $75,459 $140,831 $77,774
617,820
kWh
$(-2,315.0)
-
MMBtu
TOTAL IMPLEMENTED $50,861 $37,900 $50,861
268,758
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs