| Assessment Year | 1994 |
|---|---|
| Principal Product | fiber optics |
| NAICS |
n/a
|
| SIC | 3826: Laboratory Analytical Instruments |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
160,184
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $828,012 | 11,128,664 |
kWh
|
$0.074 |
| Fuel Oil #4 | $87,571 | 17,924 |
MMBtu
|
$4.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,063 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,546 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $14,534 | $20,294 |
$14,534
-
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,949 | - |
$10,949
150,352
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $2,082 | $2,792 |
$2,082
29,015
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,897 | $1,188 |
$1,897
25,498
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $1,701 | $1,440 |
$1,701
22,860
kWh
|
- | |
| 06 | 3.5217: Reuse / recycle/ sell paper products | $28,200 | $700 | - |
$28,200
-
lb
|
|
| 07 | 3.5313: Increase amount of waste recovered for resale | $4,700 | - | - |
$4,700
-
lb
|
|
| TOTAL RECOMMENDED | $64,063 | $26,414 |
$31,163
227,725
kWh
|
$32,900
-
lb
|
||
| TOTAL IMPLEMENTED | $17,546 | $1,188 |
$12,846
175,850
kWh
|
$4,700
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs