| Assessment Year | 1994 |
|---|---|
| Principal Product | sheet metal cabinets |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 79 |
| Plant Area |
112,200
ft2
|
| Annual Production | 5,000,000
lb
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $115,860 | 945,193 |
kWh
|
$0.12 |
| Natural Gas | $84,122 | 11,499 |
MMBtu
|
$7.32 |
| Fuel Oil #2 | $5,344 | 1,220 |
MMBtu
|
$4.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,388 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $30,270 | $59,522 | - | - | - | $30,270 | |
| 02 | 2.2437: Recover waste heat from equipment | $5,790 | $23,672 | - |
$5,790
-
MMBtu
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,605 | - |
$5,605
47,186
kWh
|
- | - | - | |
| 04 | 2.7231: Use radiant heater for spot heating | $5,208 | $6,560 | - |
$5,208
-
MMBtu
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $3,090 | - |
$3,090
25,205
kWh
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $323 | $225 |
$323
2,638
kWh
|
- | - | - | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $9,505 | $2,697 | - | - |
$9,505
-
lb
|
- | |
| 08 | 3.6192: Use a less expensive method of waste removal | $2,800 | - | - | - |
$2,800
-
lb
|
- | |
| TOTAL RECOMMENDED | $62,591 | $92,676 |
$9,018
75,029
kWh
|
$10,998
-
MMBtu
|
$12,305
-
lb
|
$30,270 | ||
| TOTAL IMPLEMENTED | $53,388 | $68,779 |
$5,605
47,186
kWh
|
$5,208
-
MMBtu
|
$12,305
-
lb
|
$30,270 | ||