ITAC Assessment: MA0310
ITAC logo
ITAC Assessment: MA0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product sheet metal cabinets
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 79
Plant Area 112,200
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,860 945,193
kWh
Natural Gas $84,122 11,499
MMBtu
Fuel Oil #2 $5,344 1,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $30,270 $59,522 - - - $30,270
02 2.2437: Recover waste heat from equipment $5,790 $23,672 - $5,790
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,605 - $5,605
47,186
kWh
- - -
04 2.7231: Use radiant heater for spot heating $5,208 $6,560 - $5,208
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $3,090 - $3,090
25,205
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $323 $225 $323
2,638
kWh
- - -
07 3.1191: Change procedures / equipment / operating conditions $9,505 $2,697 - - $9,505
-
lb
-
08 3.6192: Use a less expensive method of waste removal $2,800 - - - $2,800
-
lb
-
TOTAL RECOMMENDED $62,591 $92,676 $9,018
75,029
kWh
$10,998
-
MMBtu
$12,305
-
lb
$30,270
TOTAL IMPLEMENTED $53,388 $68,779 $5,605
47,186
kWh
$5,208
-
MMBtu
$12,305
-
lb
$30,270
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs