| Assessment Year | 1996 |
|---|---|
| Principal Product | Aerospace Fasteners |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
50,000
ft2
|
| Annual Production | 9,600
pieces
|
| Production Hrs. Annual | 4,200
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $152,338 | 2,294,256 |
kWh
|
$0.066 |
| Electricity Demand | $44,178 | 6,200 |
kW-mo/yr
|
$7.13 |
| Natural Gas | $12,776 | 1,895 |
MMBtu
|
$6.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,869 | $13,500 |
$5,869
104,924
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,412 | $1,200 |
$1,412
16,706
kWh
|
- | |
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,057 | $2,600 |
$1,057
12,603
kWh
|
- | |
| 04 | 3.1293: Separate treatments for each type of solution and recycle | $7,840 | $6,000 | - |
$7,840
-
gal
|
|
| TOTAL RECOMMENDED | $16,178 | $23,300 |
$8,338
134,233
kWh
|
$7,840
-
gal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs