ITAC Assessment: SD0141
ITAC logo
ITAC Assessment: SD0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aerospace Fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 50,000
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 4,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,338 2,294,256
kWh
Electricity Demand $44,178 6,200
kW-mo/yr
Natural Gas $12,776 1,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,869 $13,500 $5,869
104,924
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,412 $1,200 $1,412
16,706
kWh
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $1,057 $2,600 $1,057
12,603
kWh
-
04 3.1293: Separate treatments for each type of solution and recycle $7,840 $6,000 - $7,840
-
gal
TOTAL RECOMMENDED $16,178 $23,300 $8,338
134,233
kWh
$7,840
-
gal
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs