| Assessment Year | 1994 |
|---|---|
| Principal Product | Flight Suits |
| NAICS |
n/a
|
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 290 |
| Plant Area |
243,088
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $151,080 | 1,541,325 |
kWh
|
$0.098 |
| Natural Gas | $3,699 | 594 |
MMBtu
|
$6.23 |
| Fuel Oil #6 | $41,184 | 12,790 |
MMBtu
|
$3.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,459 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $8,482 | - |
$8,482
86,460
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $686 | $210 |
$686
7,034
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,256 | $16,853 |
$8,256
84,115
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $4,090 | $3,058 |
$4,090
41,618
kWh
|
- | |
| 05 | 2.7122: Disconnect ballasts | $1,042 | $67 |
$1,042
10,551
kWh
|
- | |
| 06 | 2.2113: Repair or replace steam traps | $5,397 | $2,232 | - |
$5,397
-
MMBtu
|
|
| 07 | 2.6218: Turn off equipment when not in use | $1,658 | - | - |
$1,658
-
MMBtu
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $506 | - |
$506
5,275
kWh
|
- | |
| TOTAL RECOMMENDED | $30,117 | $22,420 |
$23,062
235,053
kWh
|
$7,055
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $28,459 | $22,420 |
$23,062
235,053
kWh
|
$5,397
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs